https://www.howesltd.co.uk/wp-content/uploads/2024/10/swalecliffe-map-500x125.png
Total doors: 2
Job Duration: 2 days
Project Value: Circa £8,000
You are here: Home » Projects »
This project presented a unique challenge for our team. The client approached us after discovering that the existing fire doors in their newly leased London premises were opening in the wrong direction for a designated fire exit. They required an urgent, compliant solution that would meet building regulations while minimising disruption to ongoing operations.
We supplied, and installed new outward opening fire exit doors, ensuring full compliance with a 60 minute fire rating. To achieve this, our team constructed a partition system within the existing structure and installed new compliant fire exits. This tailored approach provided a flexible and reversible solution, allowing the new doors to be removed with minimal disruption and the original doors reinstated once the lease ends.
This project highlights our capability to support property management companies, fit-out contractors, and facilities managers with professional fire door installation services. We deliver practical fire safety solutions designed to meet the operational and compliance needs of commercial properties across London and the UK.
https://www.howesltd.co.uk/wp-content/uploads/2024/10/swalecliffe-map-500x125.png
https://www.howesltd.co.uk/wp-content/uploads/2024/10/ELA-map-500x167.png
https://www.howesltd.co.uk/wp-content/uploads/2025/10/KKC-map-500x126.png